This may look like just piles of blocks to you and me, but to The Mister it represents the steady progress happening at Lakeview Trails North. These are the blocks that will form the outer walls so that the landscaping can begin. The dry utilities and wet utilities are all installed, and the curbs and gutters are just getting started. These walls are necessary to start the common landscape, but it is something that is out of the way of the rest of the work.

Morrison Homes is setting up a trailer on site; and Ashton Woods is pouring concrete slabs for its models.

As far as Elliot Road is concerned, we still have weeks of single-lane driving. SRP is working on removing the remaining power poles and then the construction crews will "hog out" the dirt in the road to the correct level. Next comes the "AB" (aggregate base) and then finally the road itself. In the meantime, the landscape installation crews are going to be doing some beginning things in the median, such as soil amendment, while the traffic is controlled.

The temperatures may be rising, but the construction continues in spite of the heat.